|
The goal of setup reduction is to reduce and eventually eliminate setups and changeovers as a consideration in production scheduling planning, make processes highly flexible. QCO can be done anytime and is a powerful key element to make Lean work. The workshop will present the steps to achieve this goal. A shopfloor workbook is included.
Benefits to your organization
• Customer Satisfaction
• Waste Elimination
• Value Added Time
• Product and Process Quality
• Cycle and Lead Time
• Productivity and Market Share
Course objectives
• Evaluate the support and resources to begin
• Form a setup team or work group
• Establish a baseline
• Separate external/internal time
• Reduce set-ups to 10 minutes or less
Training description and materials
This instructor led course with reference text, focuses in part on the study and application of Setup Reduction/Quick ChangeOver Systems and in particular its application to a Lean enterprise. The reference text is from Productivity Press Lean Shop Floor series workbooks.
Hours and cost:
Your Setup Reduction/Quick Change-Over course is a 6-hour training activity, scheduled at your convenience for up to a maximum of 20 participants. 0.6 IACET approved CEU’s will be awarded upon successful completion of the course. Pricing includes training administration, instruction, textbook & course materials, and an activity evaluation at the conclusion of training.
Suggested Retail Price: $1,699
(Additional participants may be available at an additional cost)
Course Offered Open Enrollment: Yes
Online Delivery Available: No
Certification Option: Yes
Quality Assurance Products
5S Housekeeping
Adv. Quality Planning
ASQ Refresher
Failures Mode
Global 8D
Int. Auditor
ISO 9001
ISO-TS 16949
Inventory Kanbans
Just in Time Flow
Lean Manufacturing
Measurement Systems
Poka-Yoke
Quality Control Excellence
Quality Function
Quality Industry (QuIC)
Quality Tools
Setup Reduction Quick Change
Six Sigma Black Belt Cert
Six Sigma Black Belt
Six Sigma Blended e-Learning
Statistical Process Control
Team Problem Solving
Total Productive Maintenance
Value Stream Mapping